Longjiang Dam
Coordinates24°14′25.30″N 98°6′40.16″E
CountryChina
LocationMangshi, Dehong Prefecture, Yunnan Province
PurposePower, flood control, irrigation
StatusO
Construction began2006
Opening2010 (age 16)
Dam crossesLong River
Dam length472 m (1,549 ft)
Dam height110 m (360 ft)
Dam elevation crest875 m (2,871 ft)
Dam width base23.76 m (78.0 ft)
Res capacity total1,217,000,000 m3
Res elevation872 m (2,861 ft)
Plant nameLongjiang Hydropower Plant
Plant commission2010
ConventionalLongjiang Hydropower Plant
Plant turbines3 x 80 MW Francis-type
Plant capacity240 MW

The Longjiang Dam is an arch dam on the Long River (upper of Shweli River) near Mangshi in Dehong Prefecture of Yunnan Province, China. It is a multiple-purpose project aimed at flood control, irrigation and hydroelectric power generation. Its reservoir has a storage capacity of 1,217,000,000 m3, of which 679,000,000 m3 is reserved for river these purposes. The dam's power station is located on its left bank and contains three 80 MW Francis turbine-generators for a total installed capacity if 240 MW.[1][2] Construction on the project began on 28 November 2006 and all generators were commissioned in 2010.[3]

See also

References

  1. ^ "Yunnan Longjiang Hydropower Project completion and acceptance by (云南龙江水电站枢纽工程通过竣工验收)" (in Chinese). Nanjing Hydraulic Research Institute. 3 January 2014. Archived from the original on 13 February 2014. Retrieved 7 July 2014.
  2. ^ "Yunnan Longjiang 240MW Hydropower Project, in P.R. China". United Nations Clean Development Mechanism. 28 July 2006. Retrieved 7 July 2014.[dead link]
  3. ^ "Longjiang Hydropower Project in Yunnan" (in Chinese). Xinhua Water Conservancy Holdings Corporation. 9 April 2011. Archived from the original on 14 July 2014. Retrieved 7 July 2014.