This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2025, there are 439 operable power reactors in the world, with a combined electrical capacity of 397.7 GW. Additionally, there are 68 reactors under construction and 108 reactors planned, with a combined capacity of 74 GW and 103 GW, respectively, while 359 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]

In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[3]

Argentina

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Atucha[4]1PHWRSiemens-KWU3621 Jun 196824 Jun 1974
2PHWRSiemens-KWU74514 Jul 198127 Jun 2014
3PWRHualong One[5]1200
Embalse[6]1PHWRCANDU-66831 Apr 197420 Jan 1984(2049)[7]
CAREM1PWRCAREM25258 Feb 2014

Armenia

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Metsamor1PWRVVER-440/V-2703761 Jul 19696 Oct 197725 Feb 1989
2PWRVVER-440/V-2703751 Jul 19753 May 1980(2036)[8]

Austria

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Zwentendorf1BWRBWR-69 (KWU)878Apr 1972–5 Nov 1978

Bangladesh

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Rooppur1PWRVVER-1200/V-523108030 Nov 2017[9](2026)[10]
2PWRVVER-1200/V-523108014 Jul 2018(2027)

Belarus

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Ostrovets1PWRVVER-1200/V-49111096 Nov 201310 Jun 2021[11]
2PWRVVER-1200/V-491110924 Apr 20141 Nov 2023[12]
Minsk1PWRVVER-100096319831987
2PWRVVER-100096319831987

Belgium

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
SCK•CEN1PWRWestinghouse (WH) BR-3101 Nov 195710 Oct 196230 Jun 1987
Doel1PWRWH 2 loops4451 Jul 196915 Feb 197514 Feb 2025
2PWRWH 2 loops4451 Sep 19711 Dec 197530 Nov 2025
3PWRFramatome 3 loops10061 Jan 19751 Oct 198223 Sep 2022[13]
4PWRBelgian firms plus WH 3 loops10391 Dec 19781 Jul 1985(1 nov 2035)
Tihange1PWRFramatome 3 loops9621 Jun 19701 Oct 19751 oct 2025
2PWRFramatome 3 loops10081 Apr 19761 Jun 198331 Jan 2023[14]
3PWRBelgian firms plus WH 3 loops10461 Nov 19781 Sep 1985(1 nov 2035)

Brazil

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Angra1PWRWH 2 loops6091 May 19711 Jan 1985
2PWRPre-Konvoi12751 Jan 19761 Feb 2001
3PWRPre-Konvoi12451 Jun 2010(2028)[15]

Bulgaria

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Kozloduy1PWRVVER-440/V-2304081 Apr 197028 Oct 197431 Dec 2002
2PWRVVER-440/V-2304081 Apr 197010 Nov 197531 Dec 2002
3PWRVVER-440/V-2304081 Oct 197320 Jan 198131 Dec 2006
4PWRVVER-440/V-2304081 Oct 197320 Jun 198231 Dec 2006
5PWRVVER-1000/V-32010039 Jul 198023 Dec 1988
6PWRVVER-1000/V-32010031 Apr 198230 Dec 1993
7PWRAP1000[16]1150(2033)[16]
8PWRAP1000[16]1150
Belene1PWRVVER-1000/V-320
VVER-1000/V-446B
953
1011
1987
2008
2PWRVVER-1000/V-320
VVER-1000/V-446B
953
1011
1987
2008

Canada

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Pickering1PHWRCANDU 500A515Jun 196629 Jul 19711 Oct 2024
2PHWRCANDU 500A515Sep 196630 Dec 197131 Dec 1997[17]
3PHWRCANDU 500A515Dec 19671 Jun 197229 Dec 1997
4PHWRCANDU 500A515May 196817 Jun 197331 Dec 2024
5PHWRCANDU 500B516Nov 197410 May 1983(2064)
6PHWRCANDU 500B516Oct 19751 Feb 1984(2064)
7PHWRCANDU 500B516Mar 19761 Jan 1985(2064)
8PHWRCANDU 500B516Sep 197628 Feb 1986(2064)[18]
Darlington1PHWRCANDU 850878Apr 198214 Nov 1992(2052)
2PHWRCANDU 850878Sep 19819 Oct 1990(2050)
3PHWRCANDU 850878Sep 198414 Feb 1993(2053)
4PHWRCANDU 850878Jul 198514 Jun 1993(2053)
5[19]BWRBWRX-3003008 May 2025[20](2030)
6[19]BWRBWRX-300300
7BWRBWRX-300300
8BWRBWRX-300300
Bruce1PHWRCANDU 791823Jun 19711 Sep 1977(2043)
2PHWRCANDU 791823[21]Dec 19701 Sep 1977(2043)
3PHWRCANDU 750A817Jul 19721 Feb 1978(2064)[22]
4PHWRCANDU 750A817Sep 197218 Jan 1979(2064)
5PHWRCANDU 750B817Jun 19781 Mar 1985(2064)
6PHWRCANDU 750B880[23]Jan 197815 Sep 1984(2064)
7PHWRCANDU 750B817May 197910 Apr 1986(2064)
8PHWRCANDU 750B817Aug 197922 May 1987(2064)
NPD1PHWRCANDU19Jan 19584 Jun 19621 Aug 1987
Douglas Point1PHWRCANDU 200200Feb 196026 Sep 19684 May 1984
Gentilly1BWRCANDU BLWR 250250Sep 19661 May 19721 June 1977
2PHWRCANDU-6635Apr 19741 Oct 198328 Dec 2012
Point Lepreau1PHWRCANDU-6635May 19751 Feb 1983(2041)

China

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Bailong1PWRCAP-1000110022 Dec 2025
2PWRCAP-10001100
3PWRCAP-14001450
4PWRCAP-14001450
5PWRCAP-14001450
6PWRCAP-14001450
ChangjiangI-1PWRCNP-60060125 Apr 201025 Dec 2015
I-2PWRCNP-60060121 Nov 201020 Jun 2016
I-3[24]PWRHualong One120031 Mar 2021[25](2026)
I-4[24]PWRHualong One120031 Mar 2021[25](2026)
II-1PWRACP-10010013 Jul 2021
Daya Bay1PWRM-3109447 Aug 19871 Feb 1994
2PWRM-3109447 Apr 19886 May 1994
Fangchenggang1PWRCPR-1000100030 Jul 201025 Oct 2015
2PWRCPR-1000100023 Dec 201015 Jul 2016
3PWRHualong One100024 Dec 201525 Mar 2023
4PWRHualong One100024 Dec 201625 May 2024
5PWRHualong One1117
6PWRHualong One1117
Fangjiashan1PWRCPR-1000101226 Dec 200815 Dec 2014
2PWRCPR-1000101217 Jul 200912 Feb 2015
Fuqing1PWRCPR-1000100021 Nov 200819 Nov 2014
2PWRCPR-1000100017 Jun 200915 Oct 2015
3PWRCPR-1000100031 Dec 20107 Sep 2016
4PWRCPR-1000100017 Nov 201231 Jul 2017
5PWRHualong One100015 Apr 201530 Jan 2021[26]
6PWRHualong One100022 Dec 201525 Mar 2022[27]
Haiyang1PWRAP1000117024 Sep 200923 Oct 2018[28]
2PWRAP1000117020 Jun 20109 Jan 2019[29]
3PWRCAP-100011007 Jul 2022[30]
4PWRCAP-1000110022 Apr 2023[31]
5PWRCAP-10001100
6PWRCAP-10001100
Haixing[32]1PWRCAP-10001100
2PWRCAP-10001100
Hongyanhe1PWRCPR-1000106118 Aug 20076 Jun 2013
2PWRCPR-1000106128 Mar 200813 May 2014
3PWRCPR-100010617 Mar 200923 Mar 2015
4PWRCPR-1000106115 Aug 20091 Apr 2016
5PWRACPR-1000106129 Mar 20152 Aug 2021[33]
6PWRACPR-1000106124 Jul 201523 Jun 2022
Jinqimen1PWRHualong One112610 Aug 2025
2PWRHualong One112607 Apr 2026
3PWRHualong One1126
4PWRHualong One1126
5PWRHualong One1126
6PWRHualong One1126
Lianjiang[34]1PWRCAP-1000110027 Sep 2023
2PWRCAP-1000110026 April 2024
3PWRCAP-14001450
4PWRCAP-14001450
5PWRCAP-14001450
6PWRCAP-14001450
Ling Ao1PWRM-31095015 May 199728 May 2002
2PWRM-31095028 Nov 19978 Jan 2003
3PWRCPR-1000100715 Dec 200515 Sep 2010
4PWRCPR-1000100715 Jun 20067 Aug 2011
Lufeng1PWRCAP-1000110024 Feb 2025
2PWRCAP-1000110028 Mar 2025
3PWRHualong One1100
4PWRHualong One1100
5PWRHualong One10008 Sep 2022[35]
6PWRHualong One100026 Aug 2023[36]
Ningde1PWRCPR-1000101818 Feb 200815 Apr 2013
2PWRCPR-1000101812 Nov 20084 May 2014
3PWRCPR-100010188 Jan 201010 Jun 2015
4PWRCPR-1000101829 Sep 201029 Mar 2016
5PWRHualong One108028 Jul 2024
6PWRHualong One108015 Dec 2025
Pengze1PWRCAP-10001100
2PWRCAP-10001100
QinshanI-1PWRCNP-30030820 Mar 19851 Apr 1994
II-1PWRCNP-6006102 Jun 199615 Apr 2002
II-2PWRCNP-6006101 Apr 19973 May 2004
II-3PWRCNP-60061928 Apr 20065 Oct 2010
II-4PWRCNP-60061928 Jan 200730 Dec 2011
III-1PHWRCANDU-66778 Jun 199831 Dec 2002
III-2PHWRCANDU-667725 Sep 199824 Jul 2003
San'ao[37]1PWRHualong One111731 Dec 202014 Mar 2026[38]
2PWRHualong One111730 Dec 2021[39](2027)
3PWRHualong One111618 Nov 2025
4PWRHualong One1116
5PWRHualong One1116
6PWRHualong One1116
Sanmen1PWRAP1000115719 Apr 200921 Sep 2018[40]
2PWRAP1000115715 Dec 20095 Nov 2018[41]
3PWRCAP-1000116328 Jun 2022[42]
4PWRCAP-1000116322 Mar 2023[43]
5PWRHualong One1000
6PWRHualong One1000
ShidaowanI-1HTGRHTR-PM2009 Dec 20126 Dec 2023[44]
II-1PWRCAP-1400145019 Jun 2019[45]10 Nov 2024
II-2PWRCAP-140014504 Apr 2020[46]19 July 2025
III-1PWRHualong One113428 Jul 2024
III-2PWRHualong One11345 May 2025 [47]
III-3PWRHualong One1116
III-4PWRHualong One1116
Taipingling1PWRHualong One111626 Dec 201913 Feb 2026[48]
2PWRHualong One111615 Oct 2020[49](2026)
3PWRHualong One111610 Jun 2025(2030)
4PWRHualong One111610 May 2026[50]
5PWRHualong One1116
6PWRHualong One1116
Taishan1PWREPR166018 Nov 200914 Dec 2018[51]
2PWREPR166015 Apr 20107 Sep 2019[52]
3PWRHualong One1000
4PWRHualong One1000
5PWRHualong One1000
6PWRHualong One1000
7PWRHualong One1000
8PWRHualong One1000
9PWRHualong One1000
10PWRHualong One1000
Taohuajiang1PWRCAP-10001100
2PWRCAP-10001100
3PWRCAP-10001100
4PWRCAP-10001100
Tianwan1PWRVVER-1000/V-42899020 Oct 199917 May 2007
2PWRVVER-1000/V-42899020 Sep 200016 Aug 2007
3PWRVVER-1000/V-428M104527 Dec 201214 Feb 2018
4PWRVVER-1000/V-428M104527 Sep 201322 Dec 2018[53]
5PWRACPR-1000100027 Dec 20158 Sep 2020[54]
6PWRACPR-100010007 Sep 20163 Jun 2021[55]
7PWRVVER-1200/V-491115019 May 2021(2027–2028)
8PWRVVER-1200/V-491115025 Feb 2022[56](2027–2028)
Xianning1PWRCAP-10001100
2PWRCAP-10001100
Xiapu[57]I-1SFRCFR-60064229 Dec 2017(2028)
I-2SFRCFR-60064227 Dec 2020[58]
II-1PWRHualong One1000
II-2PWRHualong One1000
II-3PWRHualong One1000
II-4PWRHualong One1000
Xudabao1PWRCAP-1000125015 Nov 2023[59]
2PWRCAP-1000110017 Jul 2024
3PWRVVER-1200/V-491115028 Jul 2021[60](2027)
4PWRVVER-1200/V-491115019 May 2022[61](2028)
5PWRVVER-1200/V-4911150
6PWRVVER-1200/V-4911150
Xuwei1PWRHualong One111616 Jan 2026
2PWRHualong One1116
3HTGRHTR-PM200
Yangjiang1PWRCPR-1000100016 Dec 200825 Mar 2014
2PWRCPR-100010004 Jun 20098 Jun 2015
3PWRCPR-1000100015 Nov 20101 Jan 2016
4PWRCPR-1000100017 Nov 201215 Mar 2017
5PWRACPR-1000100018 Sep 201312 Jul 2018[62]
6PWRACPR-1000100023 Dec 201324 Jul 2019
Zhangzhou1PWRHualong One112616 Oct 2019[63]1 Jan 2025
2PWRHualong One11264 Sep 2020[49]22 Nov 2025[64]
3PWRHualong One112622 Feb 2024
4PWRHualong One112627 Sep 2024
5PWRHualong One1116
6PWRHualong One1116
Zhaoyuan1PWRHualong One111618 Nov 2025
2PWRHualong One1116
3PWRHualong One1116
4PWRHualong One1116
5PWRHualong One1116
6PWRHualong One1116

Cuba

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Juragua1PWRVVER-440/V-31844019835 Sep 1992
2PWRVVER-440/V-31844019855 Sep 1992

Czech Republic

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Dukovany1PWRVVER-440/V-2134681 Jan 19793 May 1985
2PWRVVER-440/V-2134711 Jan 197921 Mar 1986
3PWRVVER-440/V-2134681 Mar 197920 Dec 1986
4PWRVVER-440/V-2134711 Mar 197919 Jul 1987
5PWRAPR-10001055
6PWRAPR-10001055
Temelín1PWRVVER-1000/V-32010031 Feb 198710 Jun 2002
2PWRVVER-1000/V-32010031 Feb 198718 Apr 2003

Egypt

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
El Dabaa1PWRVVER-1200/V-529120020 Jul 2022[65](2028)
2PWRVVER-1200/V-529120019 Nov 2022[66]
3PWRVVER-1200/V-52912003 May 2023[67]
4PWRVVER-1200/V-529120023 Jan 2024

Finland

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)[68]
Begin
building
Commercial
operation
Closed
Hanhikivi1PWRVVER-1200/V-4911200(2023)(2029)2 May 2022[69][70]
Loviisa1PWRVVER-440/V-2135071 May 19719 May 1977
2PWRVVER-440/V-2135071 Aug 19725 Jan 1981
Olkiluoto1BWRASEA-III, BWR-25008901 Feb 197410 Oct 1979
2BWRASEA-III, BWR-25008901 Nov 197510 Jul 1982[71]
3PWREPR160012 Aug 20051 May 2023[72]

France

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Belleville1PWRP4 REP 130013101 May 19801 Jun 1988
2PWRP4 REP 130013101 Aug 19801 Jan 1989
Blayais1PWRCP19101 Jan 19771 Dec 1981
2PWRCP19101 Jan 19771 Feb 1983
3PWRCP19101 Apr 197814 Nov 1983
4PWRCP19101 Apr 19781 Oct 1983
Brennilis1HWGCR/in decommissioning701 Jul 19621 Jun 196831 Jul 1985
Bugey1GCRUNGG5401 Dec 19651 Jul 197227 May 1994
2PWRCP09101 Nov 19721 Mar 1979
3PWRCP09101 Sep 19731 Mar 1979
4PWRCP08801 Jun 19741 Jul 1979
5PWRCP08801 Jul 19743 Jan 1980
6PWREPR21670
7PWREPR21670
Cattenom1PWRP4 REP 1300130029 Oct 19791 Apr 1987
2PWRP4 REP 1300130028 Jul 19801 Feb 1988
3PWRP4 REP 1300130015 Jun 19821 Feb 1991
4PWRP4 REP 1300130028 Sep 19831 Jan 1992
ChinonA-1GCRUNGG701 Feb 19571 Feb 196416 Apr 1973
A-2GCRUNGG1801 Aug 195924 Feb 196514 Jun 1985
A-3GCRUNGG3601 Mar 19614 Aug 196615 Jun 1990
B-1PWRCP29051 Mar 19771 Feb 1984
B-2PWRCP29051 Mar 19771 Aug 1984
B-3PWRCP29051 Oct 19804 Mar 1987
B-4PWRCP29051 Feb 19811 Apr 1988
ChoozA-1PWRCHOOZ-A3051 Jan 196215 Apr 196730 Oct 1991
B-1PWRN4 REP 145015001 Jan 198415 May 2000
B-2PWRN4 REP 145015001 Jan 198415 May 2000
Civaux1PWRN4 REP 1450149515 Oct 198829 Jan 2002
2PWRN4 REP 145014951 Apr 199123 Apr 2002
Cruas1PWRCP29151 Aug 19782 Apr 1984
2PWRCP291515 Nov 19781 Apr 1985
3PWRCP291515 Apr 197910 Sep 1984
4PWRCP29151 Oct 197911 Feb 1985
Dampierre1PWRCP18901 Feb 197510 Sep 1980
2PWRCP18901 Apr 197516 Feb 1981
3PWRCP18901 Sep 197527 May 1981
4PWRCP18901 Dec 197520 Nov 1981
Fessenheim1PWRCP08801 Sep 19711 Jan 197822 Feb 2020
2PWRCP08801 Feb 19721 Apr 197829 Jun 2020
Flamanville1PWRP4 REP 130013301 Dec 19791 Dec 1986
2PWRP4 REP 130013301 May 19809 Mar 1987
3PWREPR[73]16303 Dec 20075 May 2026
Golfech1PWRP4 REP 1300131017 Nov 19821 Feb 1991
2PWRP4 REP 130013101 Oct 19844 Mar 1994
Gravelines1PWRCP19101 Feb 197525 Nov 1980
2PWRCP19101 Mar 19751 Dec 1980
3PWRCP19101 Dec 19751 Jun 1981
4PWRCP19101 Apr 19761 Oct 1981
5PWRCP19101 Oct 197915 Jan 1985
6PWRCP19101 Oct 197925 Oct 1985
7PWREPR21670
8PWREPR21670
Nogent1PWRP4 REP 1300131026 May 198124 Feb 1988
2PWRP4 REP 130013101 Jan 19821 May 1989
Paluel1PWRP4 REP 1300133015 Aug 19771 Dec 1985
2PWRP4 REP 130013301 Jan 19781 Dec 1985
3PWRP4 REP 130013301 Feb 19791 Feb 1986
4PWRP4 REP 130013301 Feb 19801 Jun 1986
Penly1PWRP4 REP 130013301 Sep 19821 Dec 1990
2PWRP4 REP 130013301 Aug 19841 Nov 1992
3PWREPR21670(2024)
4PWREPR21670(2024)[74]
Phénix1FBRPH-2501301 Nov 196814 Jul 19741 Feb 2010
Saint-Alban1PWRP4 REP 1300133529 Jan 19791 May 1986
2PWRP4 REP 1300133531 Jul 19791 Mar 1987
Saint-LaurentA-1GCRUNGG3901 Oct 19631 Jun 196918 Apr 1990
A-2GCRUNGG4651 Jan 19661 Nov 197127 May 1992
B-1PWRCP29151 May 19761 Aug 1983
B-2PWRCP29151 Jul 19761 Aug 1983
Superphénix1FBRNa-1200/in decommissioning120013 Dec 19761 Dec 198631 Dec 1998
Tricastin1PWRCP19151 Nov 19741 Dec 1980
2PWRCP19151 Dec 19741 Dec 1980
3PWRCP19151 Apr 197511 May 1981
4PWRCP19151 May 19751 Nov 1981

Germany

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
AVR1HTGRPBR Prototype131 Aug 196119 May 196931 Dec 1988
Biblis1PWRSiemens-KWU11671 Jan 197026 Feb 19756 Aug 2011
2PWRKWU12401 Feb 197231 Jan 19776 Aug 2011
Brokdorf1PWRKWU14101 Jan 197622 Dec 198631 Dec 2021
Brunsbüttel1BWRBWR-6977115 Apr 19709 Feb 19776 Aug 2011
Emsland1PWRKonvoi (KWU)132910 Aug 198220 Jun 198815 Apr 2023
Grafenrheinfeld1PWRKWU12751 Jan 197517 Jun 198227 Jun 2015
Greifswald1PWRVVER-440/V-2304081 Mar 197012 Jul 197414 Feb 1990
2PWRVVER-440/V-2304081 Mar 197016 Apr 197514 Feb 1990
3PWRVVER-440/V-2304081 Apr 19721 May 197828 Feb 1990
4PWRVVER-440/V-2304081 Apr 19721 Nov 197922 Jul 1990
5PWRVVER-440/V-2134081 Dec 19761 Nov 198924 Nov 1989
6PWRVVER-440/V-213408
Grohnde1PWRKWU13601 Jun 19761 Feb 198531 Dec 2021[75]
Grosswelzheim1BWRBWR251 Jan 19652 Aug 197020 Apr 1971
GundremmingenABWRGE, BWR-123712 Dec 196212 Apr 196713 Jan 1977
BBWRBWR-72 (KWU)128420 Jul 197619 Jul 198431 Dec 2017[76]
CBWRBWR-72 (KWU)128820 Jul 197618 Jan 198531 Dec 2021[75]
Isar1BWRBWR-698781 May 197221 Mar 19796 Aug 2011
2PWRKonvoi (KWU)141015 Sep 19829 Apr 198815 Apr 2023
Kahl1BWRBWR151 Jul 19581 Feb 196225 Nov 1985
SNR-3001FBR19721985
KNK II1FBR171 Sep 19743 Mar 197923 Aug 1991
Krümmel1BWRBWR-69 (KWU)13465 Apr 197428 Mar 19846 Aug 2011
Lingen1BWRBWR1831 Oct 19641 Oct 19685 Jan 1977
Mülheim-Kärlich1PWRB & W121915 Jan 19758 Aug 19879 Sep 1988
MZFR1PHWRPHWR521 Dec 196119 Dec 19663 May 1984
Neckarwestheim1PWRKWU7851 Feb 19721 Dec 19766 Aug 2011
2PWRKonvoi (KWU)13109 Nov 198215 Apr 198915 Apr 2023
Niederaichbach1HWGCRPressure tube reactor1001 Jun 19661 Jan 197331 Jul 1974
Obrigheim1PWRSiemens34015 Mar 196531 Mar 196911 May 2005
Philippsburg1BWRBWR-698901 Oct 197026 Mar 19806 Aug 2011
2PWRKWU14027 Jul 197718 Apr 198531 Dec 2019[77]
Rheinsberg1PWRVVER-70621 Jan 196011 Oct 19661 Jun 1990
Stade1PWRSiemens6401 Dec 196719 May 19724 Nov 2003
Stendal1PWRVVER-1000/V-32019831990
2PWRVVER-1000/V-32019831990
THTR-3001HTGRPBR2963 May 19711 Jun 198729 Sep 1988
Unterweser1PWRKWU13451 Jul 19726 Sep 19796 Aug 2011
Würgassen1BWRBWR-69 (AEG)64026 Jan 196811 Nov 197526 Aug 1994

Hungary

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Paks1PWRVVER-440/V-2134701 Aug 197410 Aug 1983
2PWRVVER-440/V-2134731 Aug 197414 Nov 1984
3PWRVVER-440/V-2134731 Oct 19791 Dec 1986
4PWRVVER-440/V-2134711 Oct 19791 Nov 1987
5PWRVVER-120011145 Feb 2026[78]
6PWRVVER-12001114(2026)

India

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Chutka1PHWRIPHWR-700630
2630
Gorakhpur16302022
26302022
3630
4630
Kaiga1IPHWR-2202021 Sep 198916 Nov 2000
22021 Dec 198916 Mar 2000
320230 Mar 20026 May 2007
420210 May 200220 Jan 2011
5IPHWR-7006301 Mar 2026
66301 Mar 2026
Kakrapar1IPHWR-2202021 Dec 19846 May 1993
22021 Apr 19851 Sep 1995
3IPHWR-70063022 Nov 201030 Jun 2023
463022 Nov 201031 Mar 2024
Kudankulam1PWRVVER-1000/V-41293231 Mar 200231 Dec 2014
29324 Jul 200231 Mar 2017
391730 Jun 2017(2026)
491723 Oct 2017(2027)
591729 Jun 2021(2029)
691720 Dec 2021(2030)
Madras1PHWRIPHWR-2202051 Jan 197127 Jan 1984
22051 Oct 197221 Mar 1986
3SFRPFBR49023 Oct 20046 April 2026
Mahi Banswara1PHWRIPHWR-700630(2031)
2630(2032)
3630(2033)
4630(2034)
Narora1IPHWR-2202021 Dec 19761 Jan 1991
22021 Nov 19771 Jul 1992
Rajasthan1CANDU901 Aug 196516 Dec 19739 Oct 2004[79]
21871 Apr 19681 Apr 1981
3IPHWR-2202021 Feb 19901 Jun 2000
42021 Oct 199023 Dec 2000
520218 Sep 20024 Feb 2010
620220 Jan 200331 Mar 2010
7IPHWR-70063018 Jul 201115 Apr 2025
863030 Sep 2011(2026)
Tarapur1BWRBWR-1 (Mark 2)1501 Oct 196428 Oct 1969
21501 Oct 196428 Oct 1969
3PHWRIPHWR-54049012 May 200018 Aug 2006
44908 Mar 200012 Sep 2005

Iran

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Bushehr1PWRVVER-1000/V-4469151 May 197523 Sep 2013
2PWRVVER-1000/V-52891527 Sep 2019
3PWRVVER-1000915
Darkhovin1PWR360

Italy

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Caorso1BWRBWR-4 Mark28601 Jan 19701 Dec 19811 Jul 1990
Enrico Fermi1PWRWH 4-loop2601 Jul 19611 Jan 19651 Jul 1990
Garigliano1BWRBWR-11501 Nov 19591 Jun 19641 Mar 1982
Latina1GCRMagnox1531 Nov 19581 Jan 19641 Dec 1987
Montalto1BWR9821 Jul 19821 Jan 1988
2BWR9821 Jul 19821 Jul 1988
Trino 21PWR95023 dec 1987
2PWR95023 dec 1987

Japan

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Fugen1HWLWRATR14810 May 197220 Mar 197929 Mar 2003
Fukushima Daiichi1BWRBWR-343925 Jul 196726 Mar 197119 May 2011
2BWRBWR-47609 Jun 196918 Jul 197419 May 2011
3BWRBWR-476028 Dec 197027 Mar 197619 May 2011
4BWRBWR-476012 Feb 197312 Oct 197819 May 2011
5BWRBWR-476022 May 197218 Apr 197817 Dec 2013
6BWRBWR-5106726 Oct 197324 Oct 197917 Dec 2013
Fukushima Daini1BWRBWR-5106716 Mar 197620 Apr 198230 Sep 2019
2BWRBWR-5106725 May 19793 Feb 198430 Sep 2019
3BWRBWR-5106723 Mar 198121 Jun 198530 Sep 2019
4BWRBWR-5106728 May 198125 Aug 198730 Sep 2019
Genkai1PWRMitsubishi (2-loop)52915 Sep 197115 Oct 197527 Apr 2015
2PWRMitsubishi (2-loop)5291 Feb 197730 Mar 19819 Apr 2019
3PWRMitsubishi (4-loop)11271 Jun 198818 Mar 1994
4PWRMitsubishi (4-loop)112715 Jul 199225 Jul 1997
Hamaoka1BWRBWR-451510 Jun 197117 Mar 197630 Jan 2009
2BWRBWR-480614 Jun 197429 Nov 197830 Jan 2009
3BWRBWR-5105618 Apr 198328 Aug 1987
4BWRBWR-5109213 Oct 19893 Sep 1993
5BWRABWR132512 Jul 200018 Jan 2005
Higashidōri (Tōhoku)1BWRBWR-510677 Nov 20008 Dec 2005
Higashidōri (Tokyo)1BWRABWR135025 Jan 2011[80]
Ikata1PWRMitsubishi (2-loop)5381 Sep 197330 Sep 197725 Mar 2016
2PWRMitsubishi (2-loop)5381 Aug 197819 Mar 198227 Mar 2018
3PWRMitsubishi (3-loop)8461 Oct 199015 Dec 1994
Kashiwazaki-Kariwa1BWRBWR-510675 Jun 198018 Sep 1985
2BWRBWR-5106718 Nov 198528 Sep 1990
3BWRBWR-510677 Mar 198911 Aug 1993
4BWRBWR-510675 Mar 199011 Aug 1994
5BWRBWR-5106720 Jun 198510 Apr 1990
6BWRABWR13153 Nov 19927 Nov 1996
7BWRABWR13151 Jul 19932 Jul 1997
Mihama1PWRMitsubishi (2-loop)3201 Feb 196728 Nov 1970Mar 2015
2PWRMitsubishi (2-loop)47029 May 196825 Jul 1972Mar 2015
3PWRMitsubishi (3-loop)7807 Aug 19721 Dec 1976
Monju1FBR24610 May 198629 Aug 19955 Dec 2017
Ōi1PWRW (4-loop)112026 Oct 197227 Mar 1979Dec 2017
2PWRWestinghouse (4-loop)11208 Dec 19725 Dec 1979Dec 2017
3PWRMitsubishi (4-loop)11273 Oct 198718 Dec 1991
4PWRMitsubishi (4-loop)112713 Jun 19882 Feb 1993
Ōma1BWRABWR13257 May 2010
Onagawa1BWRBWR-44988 Jul 19801 Jun 198421 Dec 2018
2BWRBWR-579612 Apr 199128 Jul 1995
3BWRBWR-579623 Jan 199830 Jan 2002
Sendai1PWRMitsubishi (3-loop)84615 Dec 19794 Jul 1984
2PWRMitsubishi (3-loop)84612 Oct 198128 Nov 1985
Shika1BWRBWR-55051 Jul 198930 Jul 1993
2BWRABWR110820 Aug 200115 Mar 2006
Shimane1BWRBWR-34392 Jul 197029 Mar 1974Mar 2015
2BWRBWR-57892 Feb 198510 Feb 1989
3BWRABWR132512 Oct 2007
Takahama1PWRMitsubishi (3-loop)78025 Apr 197014 Nov 1974
2PWRMitsubishi (3-loop)7809 Mar 197114 Nov 1975
3PWRMitsubishi (3-loop)83012 Dec 198017 Jan 1985
4PWRMitsubishi (3-loop)83019 Mar 19815 Jun 1985
Tōkai1GCRMagnox1371 Mar 196125 Jul 196631 Mar 1998
2BWRBWR-510603 Oct 197328 Nov 1978
Tomari1PWRMitsubishi (2-loop)55018 Apr 198522 Jun 1989
2PWRMitsubishi (2-loop)55013 Jun 198512 Apr 1991
3PWRMitsubishi (3-loop)86618 Nov 200422 Dec 2009
Tsuruga1BWRBWR-234024 Nov 196614 Mar 1970Mar 2015
2PWRMitsubishi (4-loop)11086 Nov 198217 Feb 1987

Kazakhstan

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Aktau1FBRBN-3503501 Oct 196416 Jul 197322 Apr 1999

Lithuania

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Ignalina1LWGRRBMK-150011851 May 197731 Dec 198331 Dec 2004
2LWGRRBMK-150011851 Jan 1978Aug 198731 Dec 2009
3LWGRRBMK-15001185

Mexico

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Laguna Verde1BWRBWR-58041 Oct 197628 Jul 1990
2BWRBWR-58001 Jun 197710 Apr 1995

Netherlands

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Borssele1PWRKWU 2LP4821 Jul 196926 Oct 1973(2033)
Dodewaard1BWRBWR-2551 May 196526 Mar 196926 Mar 1997

North Korea

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Yongbyon1GCRMagnox (Pu-production)[citation needed]5[citation needed]1994
2LWR[81][82]30
Taechon12001994
Kumho1PWR10002003
2PWR10002003

Pakistan

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Chashma1PWRCNP-3003001 Aug 199315 Sep 2000
2PWRCNP-30030028 Dec 200518 May 2011
3PWRCNP-30031528 May 20116 Dec 2016
4PWRCNP-30031318 Dec 201119 Sep 2017
5PWRHualong One110030 Dec 2024
Karachi1PHWRCANDU901 Aug 19667 Dec 19721 Aug 2021
2PWRHualong One101423 May 201319 Mar 2021[83]
3PWRHualong One101431 May 201618 Apr 2022

Philippines

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Bataan1PWRWestinghouse62119761986

Poland

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Żarnowiec1PWRVVER-44044031 Mar 19824 Sep 1990
2PWRVVER-44044031 Mar 19824 Sep 1990
3PWRVVER-440440
4PWRVVER-440440
Lubiatowo-Kopalino[84]1PWRAP10001250[85](2026)(2033)[86]
2PWRAP10001250(2035–2036)[86]
3PWRAP10001250(2037–2039)[86]
Pątnów[87]1PWRAPR-14001340
2PWRAPR-14001340
Włocławek1BWRBWRX-300300(2030)[88]
Ostrołęka1BWRBWRX-300300(2030)[88]
Warsaw1BWRBWRX-300300(2030)[88]
Tarnobrzeg/Stalowa Wola1BWRBWRX-300300(2030)[88]
Dąbrowa Górnicza1BWRBWRX-300300(2030)[88]
Stawy Monowskie1BWRBWRX-300300(2030)[88]
Kraków1BWRBWRX-300300(2030)[88]

Romania

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Cernavodă1PHWRCANDU-665031 Mar 19832 Dec 1996
2PHWRCANDU-66501 Jul 19831 Nov 2007
3PHWRCANDU-6650
4PHWRCANDU-6650
5PHWRCANDU-6650

Russia

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Akademik Lomonosov1PWRKLT-40S3215 Apr 200719 Dec 2019[89]
2PWRKLT-40S3215 Apr 200719 Dec 2019
Balakovo1PWRVVER-1000/V-3209501 Dec 198023 May 1986
2PWRVVER-1000/V-3209501 Aug 198118 Jan 1988
3PWRVVER-1000/V-3209501 Nov 19828 Apr 1989
4PWRVVER-1000/V-3209501 Apr 198422 Dec 1993
Beloyarsk1LWGRAMB-1001021 Jun 195826 Apr 19641 Jan 1983
2LWGRAMB-2001461 Jan 19621 Dec 19691 Jan 1990
3SFRBN-6005601 Jan 19691 Nov 1981
4SFRBN-80078918 Jul 200610 Dec 2015
5SFRBN-12001100
Bilibino1LWGREGP-6111 Jan 19701 Apr 197414 Jan 2019
2LWGREGP-6111 Jan 19701 Feb 19753 Dec 2025
3LWGREGP-6111 Jan 19701 Feb 197611 Dec 2025
4LWGREGP-6111 Jan 19701 Jan 197730 Dec 2025
Kalinin1PWRVVER-1000/V-3389501 Feb 197712 Jun 1985
2PWRVVER-1000/V-3389501 Feb 19823 Mar 1987
3PWRVVER-1000/V-3209501 Oct 19858 Nov 2005
4PWRVVER-1000/V-3209501 Aug 198625 Dec 2012
Kaliningrad1PWRVVER-1200/V-491110922 Feb 2012
Kola1PWRVVER-440/V-2304411 May 197028 Dec 1973
2PWRVVER-440/V-2304411 May 197021 Feb 1975
3PWRVVER-440/V-2134411 Apr 19773 Dec 1982
4PWRVVER-440/V-2134411 Aug 19766 Dec 1984
Kola II[90][91]1PWRVVER-S-600600(2028)(2034)
2PWRVVER-S-600600(2028)(2034)
Kursk1LWGRRBMK-10009251 Jun 197212 Oct 197719 Dec 2021
2LWGRRBMK-10009251 Jan 197317 Aug 197931 Jan 2024[92]
3LWGRRBMK-10009251 Apr 197830 Mar 1984
4LWGRRBMK-10009251 May 19815 Feb 1986
5LWGRRBMK-10009251985
6LWGRRBMK-10009251985
Kursk II1PWRVVER-TOI/V-510[93]111529 Apr 201831 Dec 2025[94]
2PWRVVER-TOI/V-510111515 Apr 2019[95](2027)
3PWRVVER-TOI/V-510111531 Jan 2026
4PWRVVER-TOI1115
Leningrad1LWGRRBMK-10009251 Mar 19701 Nov 197421 Dec 2018[96]
2LWGRRBMK-10009251 Jun 197011 Feb 197610 Nov 2020
3LWGRRBMK-10009251 Dec 197329 Jun 1980
4LWGRRBMK-10009251 Feb 197529 Aug 1981
Leningrad II[97]1PWRVVER-1200/V-491108525 Oct 200829 Oct 2018
2PWRVVER-1200/V-491108515 Apr 201022 Mar 2021
3PWRVVER-1200108514 Mar 2024[98](2030)
4PWRVVER-1200108521 Mar 2025[99](2032)
MPEB No. 1[100][101][102]1PWRRITM-200S5330 Aug 2022[103](2027)
2PWRRITM-200S5330 Aug 2022[103](2027)
MPEB No. 21PWRRITM-200S53(2022)(2027)
2PWRRITM-200S53(2022)(2027)
MPEB No. 31PWRRITM-200S53(2022)(2028)
2PWRRITM-200S53(2022)(2028)
MPEB No. 41PWRRITM-200S53(2022)(2031)
2PWRRITM-200S53(2022)(2031)
Novovoronezh1PWRVVER/V-2101971 Jul 195731 Dec 196416 Feb 1988
2PWRVVER/V-3653361 Jun 196414 Apr 197029 Aug 1990
3PWRVVER-440/V-1793851 Jul 196729 Jun 197225 Dec 2016
4PWRVVER 440/V-1793851 Jul 196724 Mar 1973
5PWRVVER-1000/V-1879501 Mar 197420 Feb 1981
Novovoronezh II1PWRVVER-1200/V-392M111424 Jun 200827 Feb 2017
2PWRVVER-1200/V-392M111412 Jul 20096 Nov 2019
3PWRVVER-12001175
Obninsk1LWGRAM-151 Jan 19511 Dec 195429 Apr 2002
Rostov1PWRVVER-1000/V-3209501 Sep 198125 Dec 2001
2PWRVVER-1000/V-3209501 May 198310 Dec 2010
3PWRVVER-1000/V-32095015 Sep 200927 Dec 2014
4PWRVVER-1000/V-320101116 Jun 201028 Sep 2018
Sakha1PWRRITM-200N55(2024)[104](2028)
Seversk1FBRBREST-3002808 Jun 2021[105](2026)
Smolensk1LWGRRBMK-10009251 Oct 197530 Sep 1983
2LWGRRBMK-10009251 Jun 19762 Jul 1985
3LWGRRBMK-10009251 May 198412 Oct 1990
Smolensk II[106][107]1PWRVVER-TOI1300
2PWRVVER-TOI1300

Slovakia

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
BohuniceA-1[108]HWGCRKS 150931 Aug 195825 Dec 197222 Feb 1977
1[109]PWRVVER-440/V-23040824 Apr 19721 Apr 198031 Dec 2006
2PWRVVER-440/V-23040824 Apr 19721 Jan 198131 Dec 2008
3PWRVVER-440/V-2134721 Dec 197614 Feb 1985(2045)
4PWRVVER-440/V-2134711 Dec 197618 Dec 1985(2045)
Mochovce1PWRVVER-440 V-21343613 Oct 198329 Oct 1998(2058)
2PWRVVER-440/V-21343613 Oct 198311 Apr 2000(2060)
3PWRVVER-440/V-21344027 Jan 198717 Oct 2023[110]
4PWRVVER-440/V-21344027 Jan 1987

Slovenia

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Krško1PWRWH 2 loops68830 Mar 19751 Jan 1983(2043)[111]
2PWRTBD1100(2030)[112]

South Africa

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Koeberg1PWRCP1 (France)9301 Jul 197621 Jul 1984
2PWRCP1 (France)9301 Jul 19769 Nov 1985

South Korea

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
(planned)
Closed
Hanbit1PWRWH F9604 Jun 198125 Aug 1986
2PWRWH F95810 Dec 198110 Jun 1987
3PWROPR-100099723 Dec 198931 Mar 1995
4PWROPR-100099726 May 19901 Jan 1996
5PWROPR-100099729 Jun 199721 May 2002
6PWROPR-100099520 Nov 199724 Dec 2002
Hanul1PWRCP1 (France)96026 Jan 198310 Sep 1988
2PWRCP1 (France)9625 Jul 198330 Sep 1989
3PWROPR-100099421 Jul 199311 Aug 1998
4PWROPR-10009981 Nov 199331 Dec 1999
5PWROPR-10009961 Oct 199929 Jul 2004
6PWROPR-100099629 Sep 200022 Apr 2005
Shin-Hanul1PWRAPR-1400134010 Jul 20127 Dec 2022[113]
2PWRAPR-1400134019 Jul 201205 Apr 2024[114]
3PWRAPR-1400[115]134020 May 2025(2032)
4PWRAPR-1400[116]134029 May 2026(2033)
Kori1PWRWH 6057627 Apr 197229 Apr 197818 Jun 2017
2PWRWH F6404 Dec 197725 Jul 1983
3PWRWH F10111 Oct 197930 Sep 1985
4PWRWH F10121 Apr 198029 Apr 1986
Shin-Kori1PWROPR-100099616 Jun 200628 Feb 2011
2PWROPR-10009965 Jun 200720 Jul 2012
Saeul1PWRAPR-1400141616 Oct 200815 Jan 2016
2PWRAPR-1400141819 Aug 200929 Aug 2019[117]
3PWRAPR-140014001 Apr 2017
4PWRAPR-1400140020 Sep 2018
Wolsong1PHWRCANDU-665730 Oct 197722 Apr 198324 Dec 2019
2PHWRCANDU-665522 Jun 19921 Jul 1997
3PHWRCANDU-668417 Mar 19941 Jul 1998
4PHWRCANDU-668822 Jul 19941 Oct 1999
Shin-Wolsong1PWROPR-100099120 Nov 200731 Jul 2012
2PWROPR-100096023 Sep 200826 Feb 2015

Spain

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Almaraz1PWRWH 3 loops10113 Jul 19731 Sep 1983
2PWRWH 3 loops10063 Jul 19731 Jul 1984
Ascó1PWRWH 3 loops99516 May 197410 Dec 1984
2PWRWH-3 loops9977 Mar 197531 Mar 1986
Cofrentes1BWRBWR-610649 Sep 197511 Mar 1985
José Cabrera1PWRWH 1 loop14124 Jun 196413 Aug 196930 Apr 2006
Lemoniz1PWR19721984
2PWR19721984
Santa María de Garoña1BWRBWR-344611 May 197115 Feb 19756 Jul 2013
Trillo1PWRKWU 3 loops100317 Aug 19796 Aug 1988
Valdecaballeros1BWR19751984
2BWR19751984
Vandellòs1GCRUNGG48019672 Aug 197231 Jul 1990
2PWRWH 3 loops104529 Dec 19808 Mar 1988

Sweden

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Ågesta1PHWRR3/in decommissioning101 Dec 19571 May 19642 Jun 1974[a]
Barsebäck1BWRASEA-II/in decommissioning6001 Feb 19711 Jul 197530 Nov 1999[b]
2BWRASEA-II/in decommissioning6001 Jan 19731 Jul 197731 May 2005[c]
Forsmark1BWRASEA-III, BWR-25009861 Jun 197310 Dec 1980[d]
2BWRASEA-III, BWR-250011161 Jan 19757 Jul 1981[e]
3BWRASEA-IV, BWR-300011671 Jan 197918 Aug 1985[f]
Oskarshamn1BWRASEA-I/in decommissioning4731 Aug 19666 Feb 197219 Jun 2017[g]
2BWRASEA-II/in decommissioning6381 Sep 19691 Jan 197522 Dec 2016[h]
3BWRASEA-IV, BWR-300014501 May 198015 Aug 1985[i]
Marviken1BHWRR41961 Apr 196527 may 1970[j]
Ringhals1BWRASEA-I/in decommissioning8811 Feb 19691 Jan 197631 Dec 2020[k]
2PWRWH 3-loops/in decommissioning9041 Oct 19701 May 197530 Dec 2019[l]
3PWRWH 3-loops10621 Sep 19729 Sep 1981[m]
4PWRWH 3-loops11041 Nov 197321 Nov 1983[n]

Switzerland

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed[118]
Beznau1PWRWH 2-loops3651 Sep 19651 Sep 1969(2029)
2PWRWH 2-loops3651 Jan 19681 Dec 1971(2031)
Gösgen1PWRKWU 3-loops10101 Dec 19731 Nov 1979
Leibstadt1BWRBWR-612201 Jan 197415 Dec 1984
Lucens1HWGCRHWGCR61 Apr 196229 Dec 196621 Jan 1969
Mühleberg1BWRBWR-4/in decommissioning3731 Mar 19676 Nov 197220 Dec 2019

Taiwan

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Jinshan1BWRBWR-46362 Jun 197210 Dec 19783 Oct 2018
2BWRBWR-46367 Dec 197315 Jul 19793 Oct 2018
Kuosheng1BWRBWR-698519 Nov 197528 Dec 19811 Jul 2021[119]
2BWRBWR-698515 Mar 197616 Mar 198315 Mar 2023
Lungmen1BWRABWR135031 Mar 199927 April 2014 [120]
2BWRABWR135030 Aug 199927 April 2014 [120]
Maanshan1PWRWH 312 3-loop95121 Aug 197827 Jul 198428 Jul 2024
2PWRWH 312 3-loop95121 Feb 197918 May 198517 May 2025

Turkey

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Akkuyu1PWRVVER-120011143 Apr 2018(2026)[121]
211148 Apr 2020(2027)
3111410 Mar 2021(2027)
4111421 Jul 2022[122](2028)
Sinop1PWRAPR+1120(2035)[123]
21120
31120
41120
Thracian1PWRCAP14001500(2040)[124]
21500
31500
41500

Ukraine

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Chernobyl1LWGRRBMK-10007401 Mar 197027 May 197830 Nov 1996
2LWGRRBMK-10009251 Feb 197328 May 197911 Oct 1991
3LWGRRBMK-10009251 Mar 19768 Jun 198215 Dec 2000
4LWGRRBMK-10009251 Apr 197926 Mar 198426 Apr 1986
5LWGRRBMK-1000925
6LWGRRBMK-1000925
Chyhyryn[125]1PWRAP10001100
2PWRAP10001100
3PWRAP10001100
4PWRAP10001100
Crimean1PWRVVER-100095026 Jan 19841987
2PWRVVER-100095026 Jan 19841987
Kharkiv1PWRVVER-100090019881990
2PWRVVER-100090019881990
Khmelnytskyi1PWRVVER-1000/V-3209501 Nov 198113 Aug 1988
2PWRVVER-1000/V-3209501 Feb 198515 Dec 2005
3PWRVVER-10009501 Sep 1985(2026)[126]
4PWRVVER-10009501 Jun 1986(2027)
5PWRAP1000[127]1100April 11, 2024(2029)
6PWRAP1000[128]1100April 11, 2024(2029)
Odesa1PWRVVER-10009001989
2PWRVVER-10009001989
Rivne1PWRVVER-440/V-2133811 Aug 197322 Sep 1981
2PWRVVER-440/V-2133761 Oct 197329 Jul 1982
3PWRVVER-1000/V-3209501 Feb 198016 May 1987
4PWRVVER-1000/V-3209501 Aug 19866 Apr 2006
5PWRAP1000[128]1100
South Ukraine1PWRVVER-1000/V-3029501 Aug 19762 Dec 1983
2PWRVVER-1000/V-3389501 Jul 19816 Apr 1985
3PWRVVER-1000/V-3209501 Nov 198429 Dec 1989
4PWRAP1000[128]1100
Zaporizhzhia1PWRVVER-1000/V-3209501 Apr 198025 Dec 1985
2PWRVVER-1000/V-3209501 Jan 198115 Feb 1986
3PWRVVER-1000/V-3209501 Apr 19825 Mar 1987
4PWRVVER-1000/V-3209501 Apr 198314 Apr 1988
5PWRVVER-1000/V-3209501 Nov 198527 Oct 1989
6PWRVVER-1000/V-3209501 Jun 198617 Sep 1996
7PWRAP10001100

United Arab Emirates

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Barakah1PWRAPR-1400134519 Jul 20126 Apr 2021[129]
2PWRAPR-1400134516 Apr 201324 Mar 2022[130]
3PWRAPR-1400134524 Sep 201424 Feb 2023[131]
4PWRAPR-1400134530 Jul 20155 Sep 2024[132]

United Kingdom

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Berkeley1GCRMagnox1381 Jan 195712 Jun 196231 Mar 1989
2GCRMagnox1381 Jan 195720 Oct 196226 Oct 1988
Bradwell1GCRMagnox1231 Jan 19571 Jul 196231 Mar 2002
2GCRMagnox1231 Jan 195712 Nov 196230 Mar 2002
Calder Hall1GCRMagnox/in decommissioning491 Aug 19531 Oct 195631 Mar 2003
2GCRMagnox/in decommissioning491 Aug 19531 Feb 195731 Mar 2003
3GCRMagnox/in decommissioning491 Aug 19551 May 195831 Mar 2003
4GCRMagnox/in decommissioning491 Aug 19551 Apr 195931 Mar 2003
Chapelcross1GCRMagnox/in decommissioning481 Oct 19551 Mar 195929 Jun 2004
2GCRMagnox/in decommissioning481 Oct 19551 Aug 195929 Jun 2004
3GCRMagnox/in decommissioning481 Oct 19551 Dec 195929 Jun 2004
4GCRMagnox/in decommissioning481 Oct 19551 Mar 196029 Jun 2004
Dounreay1SFRDFR/in decommissioning111 Mar 19551 Oct 19621 Mar 1977
2SFRPFR/in decommissioning2341 Jan 19661 Jul 197631 Mar 1994
Dungeness AA-1GCRMagnox/in decommissioning2251 Jul 196028 Oct 196531 Dec 2006
A-2GCRMagnox/in decommissioning2251 Jul 196030 Dec 196531 Dec 2006
Dungeness BB-1GCRAGR5201 Oct 19651 Apr 19857 Jun 2021
B-2GCRAGR5201 Oct 19651 Apr 19897 Jun 2021
Hartlepool1GCRAGR5951 Oct 19681 Apr 1989(2027)[133]
2GCRAGR5851 Oct 19681 Apr 1989(2027)[133]
HeyshamA-1GCRAGR5851 Dec 19701 Apr 1989(2027)[133]
A-2GCRAGR5751 Dec 19701 Apr 1989(2027)[133]
B-1GCRAGR6101 Aug 19801 Apr 1989(2030)[133]
B-2GCRAGR6101 Aug 19801 Apr 1989(2030)[133]
Hinkley Point A1GCRMagnox/in decommissioning2351 Nov 195730 Mar 196523 May 2000
2GCRMagnox/in decommissioning2351 Nov 19575 May 196523 May 2000
Hinkley Point B1GCRAGR4351 Sep 19672 Oct 19781 Aug 2022[134]
2GCRAGR4351 Sep 196727 Sep 19766 Jul 2022[135]
Hinkley Point C1PWREPR160011 Dec 2018(2029)[15]
2PWREPR160012 Dec 2019(2030)[15]
Hunterston A1GCRMagnox/in decommissioning1501 Oct 19575 Feb 196430 Mar 1990
2GCRMagnox/in decommissioning1501 Oct 19571 Jul 196431 Dec 1989
Hunterston B1GCRAGR4601 Nov 19676 Feb 197626 Nov 2021
2GCRAGR4601 Nov 196731 Mar 19777 Jan 2022[136]
Oldbury1GCRMagnox/in decommissioning2171 May 196231 Dec 196729 Feb 2012
2GCRMagnox/in decommissioning2171 May 196230 Sep 196830 Jun 2011
Sizewell A1GCRMagnox/in decommissioning2101 Apr 196125 Mar 196631 Dec 2006
2GCRMagnox/in decommissioning2101 Apr 196115 Sep 196631 Dec 2006
Sizewell B1PWRWH SNUPPS119118 Jul 198822 Sep 1995(2035)
Sizewell C1PWREPR1600(2025)
2PWREPR1600(2025)
Torness1GCRAGR5951 Aug 198025 May 1988(2030)[133]
2GCRAGR5951 Aug 19803 Feb 1989(2030)[133]
Trawsfynydd1GCRMagnox/in decommissioning1951 Jul 195924 Mar 19656 Feb 1991
2GCRMagnox/in decommissioning1951 Jul 195924 Mar 19654 Feb 1991
Winfrith[137]1SGHWRSGHWR/in decommissioning921 May 19631 Jan 196811 Sep 1990
Wylfa1GCRMagnox/in decommissioning4901 Sep 19631 Nov 197130 Dec 2015
2GCRMagnox/in decommissioning4901 Sep 19633 Jan 197225 Apr 2012
3PWRSMR[138]N/A(2026)(2030)

United States

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Arkansas Nuclear One1PWRB & W (DRY-Cont)8361 Oct 196821 May 1974
2PWRCE (DRY)9886 Dec 19681 Sep 1978
Beaver Valley1PWRWH 3-loop (DRY)90826 Jun 19702 Jul 1976
2PWRWH 3-loop (DRY)9053 May 197414 Aug 1987
Big Rock Point[139]1BWRBWR-1671 May 196029 Mar 196329 Aug 1997
Braidwood1[140]PWRWH 4-loop (DRY)11941 Aug 197529 Jul 1988
2[141]PWRWH 4-loop (DRY)11601 Aug 197517 Oct 1988
Browns Ferry1BWRBWR-4 (WET)12001 May 19671 Aug 1974
2BWRBWR-4 (WET)12001 May 19671 Mar 1975
3BWRBWR-4 (WET)12101 Jul 19681 Mar 1977
Brunswick1BWRBWR-4 (WET)9387 Feb 197018 Mar 1977[142]
2BWRBWR-4 (WET)9327 Feb 19703 Nov 1975[143]
Byron1PWRWH 4-loop (DRY)11641 Apr 197516 Sep 1985
2PWRWH 4-loop (DRY)11361 Apr 19752 Aug 1987
Callaway1PWRWH 4-loop (DRY)12151 Sep 197519 Dec 1984
Calvert Cliffs1PWRCE 2-loop (DRY)8771 Jun 19688 May 1977
2PWRCE 2-loop (DRY)8551 Jun 19681 Apr 1977
Carbon Free Power Project[144][145]1PWRVOYGR77
2PWRVOYGR77
3PWRVOYGR77
4PWRVOYGR77
5PWRVOYGR77
6PWRVOYGR77
Catawba1PWRWH 4-loop (ICECOND)11601 May 197429 Jun 1985
2PWRWH 4-loop (ICECOND)11501 May 197419 Aug 1986
Clinch River1BWRBWRX-300300
Clinton1BWRBWR-6 (WET)10621 Oct 197524 Nov 1987
Columbia1BWRBWR-5 (WET)11311 Aug 197213 Dec 1984
Comanche Peak1PWRWH 4-loop (DRY)120519 Dec 197413 Aug 1990
2PWRWH 4-loop (DRY)119519 Dec 19743 Aug 1993
Connecticut Yankee1PWRWH (DRY)5821 May 19641 Jan 19685 Dec 1996
Cooper1BWRBWR-4 (WET)7691 Jun 19681 Jul 1974
Crystal River 31PWRB & W (DRY)86025 Sep 196813 Mar 19775 Feb 2013
Davis–Besse1PWRB & W (DRY)8941 Sep 197031 Jul 1978
Diablo Canyon1PWRWH 4-Loop (DRY)113823 Apr 19687 May 1985
2PWRWH 4-Loop (DRY)11189 Dec 197013 Mar 1986
Donald C. Cook1PWRWH 4-Loop (ICECOND)102025 Mar 196927 Aug 1975
2PWRWH 4-Loop (ICECOND)109025 Mar 19691 Jul 1978
Dresden1BWRBWR-11971 May 19564 Jul 196031 Oct 1978
2BWRBWR-3 (WET)89410 Jan 19669 Jun 1970
3BWRBWR-3 (WET)87914 Oct 196616 Nov 1971
Duane Arnold1BWRBWR-4 (WET)60122 May 19701 Feb 197510 Aug 2020
Edwin I. Hatch1BWRBWR-4 (WET)92430 Sep 196831 Dec 1975
2BWRBWR-4 (WET)9241 Feb 19725 Sep 1979
Elk River1BWR221 Jan 19591 Jul 19641 Feb 1968
Fermi1FBRPrototype618 Aug 19567 Aug 196629 Nov 1972
2BWRBWR-4 (WET)111526 Sep 197223 Jan 1988
Fermi America1PWRAP10001117(2026)
2PWRAP10001117
3PWRAP10001117
4PWRAP10001117
Fort Calhoun1PWRCE 2-loop (WET)4827 Jun 19689 Aug 197324 Oct 2016
Fort St. Vrain1HTGRGeneral Atomics3301 Sep 19681 Jul 197929 Aug 1989
Ginna1PWRWH 2-loop (DRY)56025 Apr 19661 Jun 1970
Grand Gulf1BWRBWR-6 (WET)14014 May 19741 Jul 1985
H. B. Robinson1PWRWH 3-loop (DRY)73513 Apr 19677 Mar 1971
Hallam1SGRAtomics International751 Jan 19591 Nov 19631 Sep 1969
HartsvilleA1[146]BWRBWR-6128523 May 1975[147]29 Aug 1984[147]
A2[146]BWRBWR-6128523 May 1975[147]29 Aug 1984[147]
B1[146]BWRBWR-6128523 May 1975[147]22 Mar 1983[147]
B2[146]BWRBWR-6128523 May 1975[147]22 Mar 1983[147]
Hope Creek1BWRBWR-4 (WET)11721 Mar 197620 Dec 1986
Humboldt Bay1BWRBWR-1631 Nov 19601 Aug 19632 Jul 1976
Indian Point1PWR2571 May 19561 Oct 196231 Oct 1974
2PWRWH 4-loop (DRY)99814 Oct 19661 Aug 197430 Apr 2020[148]
3PWRWH 4-loop (DRY)10301 Nov 196830 Aug 197630 Apr 2021[148]
James A. FitzPatrick1BWRBWR-4 (WET)8131 Sep 196828 Jul 1975
Joseph M. Farley1PWRWH 3-Loop (DRY)8741 Oct 19701 Dec 1977
2PWRWH 3-Loop (DRY)8831 Oct 197030 Jul 1981
Kemmerer1SFRNatrium34510 Jun 2024
Kewaunee1PWRWH 2-loop (DRY)5666 Aug 196816 Jun 19747 May 2013
La Crosse1BWRBWR-1481 Mar 19637 Nov 196930 Apr 1987
LaSalle County1BWRBWR-5 (WET)113710 Sep 19731 Jan 1984
2BWRBWR-5 (WET)114010 Sep 197319 Oct 1984
Limerick1BWRBWR-5 (WET)113419 Jun 19741 Feb 1986
2BWRBWR-5 (WET)113419 Jun 19748 Jan 1990
Long Mott1HTGRXe-10080
2HTGRXe-10080
3HTGRXe-10080
4HTGRXe-10080
Maine Yankee1PWRCE (DRY)8601 Oct 196828 Dec 19721 Aug 1997
Marble Hill1PWRWH (DRY)11301 Aug 197710 Jan 1984
McGuire1PWRWH 4-Loop (ICECOND)11581 Apr 19711 Dec 1981
2PWRWH 4-Loop (ICECOND)11581 Apr 19711 Mar 1984
Millstone1BWRBWR-3 (WET)6411 May 196628 Dec 197021 Jul 1998
2PWRCE 2-loop (DRY)8691 Nov 196926 Dec 1975
3PWRWH 4-Loop (DRY)12109 Aug 197423 Apr 1986
Monticello1BWRBWR-3 (WET)62819 Jun 196730 Jun 1971
Nine Mile Point1BWRBWR-2 (WET)61312 Apr 19651 Dec 1969
2BWRBWR-5 (WET)12771 Aug 197511 Mar 1988
North Anna1PWRWH 3-Loop (DRY)94819 Feb 19716 Jun 1978
2PWRWH 3-Loop (DRY)94419 Feb 197114 Dec 1980
Oconee1PWRB & W (DRY)8476 Nov 196715 Jul 1973
2PWRB & W (DRY)8486 Nov 19679 Sep 1974
3PWRB & W (DRY)8596 Nov 196716 Dec 1974
Oyster Creek1BWRBWR-2 (WET)61915 Dec 196423 Dec 196917 Sep 2018
Palisades1PWRCE 2-loop (DRY)80514 Mar 196731 Dec 197120 May 2022
2PWRSMR-300340
3PWRSMR-300340
Palo Verde1PWRCE80 2-loop (DRY)131125 May 197628 Jan 1986
2PWRCE80 2-loop (DRY)13141 Jun 197619 Sep 1986
3PWRCE80 2-loop (DRY)13121 Jun 19768 Jan 1988
Parr1PHWRCVTR171 Jan 196018 Dec 196310 Jan 1967
Pathfinder1BWRBWR-1591 Jan 19591 Aug 19661 Oct 1967
Peach Bottom1GCRPrototype401 Feb 19621 Jun 19661 Nov 1974
2BWRBWR-4 (WET)130031 Jan 19685 Jul 1974
3BWRBWR-4 (WET)133131 Jan 196823 Dec 1974
Perry1BWRBWR-6 (WET)12401 Oct 197418 Nov 1987
Phipps Bend1BWRBWR-6123310 Nov 19776 Aug 1981
2BWRBWR-6123310 Nov 19776 Aug 1981
Pilgrim1BWRBWR-3 (WET)67726 Aug 19689 Dec 197231 May 2019
Piqua1OCRAtomics International121 Jan 19601 Nov 19631 Jan 1966
Point Beach1PWRWH 2-loop (DRY)59119 Jul 196721 Dec 1970
2PWRWH 2-loop (DRY)59125 Jul 19681 Oct 1972
Prairie Island1PWRWH 2-loop (DRY)52225 Jun 196816 Dec 1973
2PWRWH 2-loop (DRY)51925 Jun 196921 Dec 1974
Quad Cities1BWRBWR-4 (WET)90815 Feb 196718 Feb 1973
2BWRBWR-4 (WET)91115 Feb 196710 Mar 1973
Rancho Seco1PWRWH (DRY)8731 Apr 196917 Apr 197523 Jun 1989
River Bend1BWRBWR-6 (WET)96725 Mar 197716 Jun 1986
Salem1PWRWH 4-loop (DRY)116925 Sep 196830 Jun 1977
2PWRWH 4-loop (DRY)115825 Sep 196831 Oct 1981
San Onofre1PWRWH (DRY)43616 Jul 19641 Jan 196830 Nov 1992
2PWRCE (DRY)10701 Mar 19748 Aug 19837 Jun 2013
3PWRCE (DRY)11801 Mar 19741 Apr 19847 Jun 2013
Saxton1PWR31 Jan 1960Nov 1961May 1972
Seabrook1PWRWH 4-Loop (DRY)12467 Jul 197615 Mar 1990
Sequoyah1PWRWH 4-Loop (ICECOND)115227 May 19701 Jul 1981
2PWRWH 4-Loop (ICECOND)113927 May 19701 Jun 1982
Shearon Harris1PWRWH 3-Loop (DRY)96428 Jan 19782 May 1987
Shippingport1PWRWH606 Sep 195426 May 1958Dec 1989
Shoreham1BWRGE8201 Nov 19721 Aug 19861 May 1989
SRE1SGR6.5195412 Jul 195715 Feb 1964
South Texas1PWRWH 4-loop (DRY)128022 Dec 197525 Aug 1988
2PWRWH 4-loop (DRY)128022 Dec 197519 Jun 1989
St. Lucie1PWRCE (DRY)9811 Jul 19701 Mar 1976
2PWRCE (DRY)9872 Jun 197710 Jun 1983
Surry1PWRWH 3-loop (DRY)83825 Jun 196822 Dec 1972
2PWRWH 3-loop (DRY)83825 Jun 19681 May 1973
Susquehanna1BWRBWR-5 (WET)12572 Nov 197312 Nov 1982
2BWRBWR-5 (WET)12572 Nov 197327 Jun 1984
Three Mile Island1PWRB & W (DRY)81918 May 19682 Sep 197420 Sep 2019
2PWRB & W (DRY)8801 Nov 196930 Dec 197828 Mar 1979
Trojan1PWRWH (DRY)10951 Feb 197020 May 19769 Nov 1992
Turkey Point3PWRWH 3-Loop (DRY)82927 Apr 196714 Dec 1972
4PWRWH 3-Loop (DRY)82127 Apr 19677 Sep 1973
Vallecitos1BWRBWR-1251 Jan 195619 Oct 19579 Dec 1963
Vermont Yankee1BWRBWR-4 (WET)605[149]11 Dec 196730 Nov 197229 Dec 2014[150]
Virgil C. Summer1PWRWH 3-Loop (DRY)97321 Mar 19731 Jan 1984
2PWRAP100011179 Mar 2013
3PWRAP100011172 Nov 2013
Vogtle1PWRWH 4-Loop (DRY)11501 Aug 19761 Jun 1987
2PWRWH 4-Loop (DRY)11521 Aug 197620 May 1989
3PWRAP1000111712 Mar 201331 Jul 2023[151]
4PWRAP1000111719 Nov 201329 April 2024[152]
Waterford1PWRCE 2-loop (DRY)116814 Nov 197424 Sep 1985
Watts Bar1PWRWH 4-Loop (ICECOND)115720 Jul 197327 May 1996
2PWRWH 4-Loop (ICECOND)11641 Sep 19734 Jun 2016
Wolf Creek1PWRWH 4-Loop (DRY)120031 May 19773 Sep 1985
Yankee Rowe1PWRWH (DRY)1671 Nov 19571 Jul 19611 Oct 1991
Zion1PWRWH (DRY)10401 Dec 196831 Dec 197313 Feb 1998
2PWRWH (DRY)10401 Dec 196817 Sep 197413 Feb 1998

Uzbekistan

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Plant in the Jizzakh Region[153]1PWRRITM-200N5524 Mar 2026
2PWRRITM-200N5524 Mar 2026
3PWRVVER-1000930
4PWRVVER-1000930

See also

Notes

  1. ^ The full reactor model name is R3/Adam.[154]
  2. ^ The full reactor model name is ASEA-ATOM Gen II.[155]
  3. ^ The full reactor model name is ASEA-ATOM Gen II.[155]
  4. ^ The full reactor model name is ASEA-ATOM Gen III,[155] BWR-2500,[155] BWR 69.[156]
  5. ^ The full reactor model name is ASEA-ATOM Gen III,[155] BWR-2500,[155] BWR 69.[156]
  6. ^ The full reactor model name is ASEA-ATOM Gen IV,[155] BWR-3000,[155] BWR 75.[156]
  7. ^ The full reactor model name is ASEA-ATOM Gen I.[155]
  8. ^ The full reactor model name is ASEA-ATOM Gen II.[155]
  9. ^ The full reactor model name is ASEA-ATOM Gen IV,[155] BWR-3000,[155] BWR 75.[157]
  10. ^ The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.[154]
  11. ^ The full reactor model name is ASEA-ATOM Gen I.[155] Closed at midnight on New Year's Eve.[158]
  12. ^ The full reactor model name is Westinghouse 3-loops.[155]
  13. ^ The full reactor model name is Westinghouse 3-loops.[155]
  14. ^ The full reactor model name is Westinghouse 3-loops.[155]

References

  1. ^ "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
  2. ^ "PRIS – Home". pris.iaea.org
  3. ^ "Reference Unit Power" at IAEA
  4. ^ "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 Aug 2019.
  5. ^ "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 Feb 2022. Retrieved 2 Feb 2022.
  6. ^ Yulia Kosarenko. "NASA fact sheet". Archived 8 Jul 2007 at the Wayback Machine. Retrieved 20 Aug 2015.
  7. ^ "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years". BNamericas.com
  8. ^ "Metsamor 2 to operate until 2036 : Corporate – World Nuclear News"
  9. ^ "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 Jul 2018.
  10. ^ "Лихачев рассказал, когда запустят первый энергоблок АЭС "Руппур"" (in ru-RU). РИА Новости. 2025-08-21. Archived 2025-08-21 at the Wayback Machine. Retrieved 2025-10-15.
  11. ^ "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru
  12. ^ "Second Belarus unit enters commercial operation". world-nuclear-news.org
  13. ^ "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 Sep 2022. Retrieved 25 Sep 2022.
  14. ^ "Second Belgian reactor enters retirement : Corporate - World Nuclear News"
  15. ^ "Plans for New Nuclear Reactors Worldwide - World Nuclear Association"
  16. ^ "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org. World Nuclear News. 25 Oct 2023. Retrieved 3 Nov 2023.
  17. ^ "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005.
  18. ^ "Pickering refurbishment gets government go-ahead". World Nuclear News. 27 November 2025. Retrieved 25 February 2026.
  19. ^ Patel, Sonal (2 Dec 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 Dec 2021.
  20. ^ https://www.world-nuclear-news.org/articles/opg-gets-go-ahead-to-build-first-smr-in-canada
  21. ^ "Unit 2 sets record run ahead of planned maintenance outage". brucepower.com. 6 May 2022. Retrieved 7 July 2023.
  22. ^ "Life-Extension Program & MCR Project". brucepower.com. Retrieved 7 July 2023.
  23. ^ "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News"
  24. ^ "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 Nov 2019.
  25. ^ "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 Apr 2021.[dead link]
  26. ^ "China's first Hualong One nuclear reactor starts commercial operations". Reuters. 30 Jan 2021. Retrieved 30 Jan 2021.
  27. ^ "Second Fuqing Hualong One enters commercial operation: New Nuclear – World Nuclear News"
  28. ^ "Second AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 Oct 2018.
  29. ^ "Fourth Chinese AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 13 Jan 2019.
  30. ^ "Construction starts on third Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 25 Jul 2022.
  31. ^ "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 Apr 2023.
  32. ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 Jul 2018.
  33. ^ "Fifth Hongyanhe unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 2 Aug 2021.
  34. ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 Jun 2018.
  35. ^ "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 Sep 2022.
  36. ^ "Construction of Lufeng 6 begins". World Nuclear News. World Nuclear Association. Retrieved 29 Aug 2023.
  37. ^ "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 Jan 2021.
  38. ^ "First San'ao unit connected to the grid". World Nuclear News. World Nuclear Association. 13 March 2026. Retrieved 2026-03-14.
  39. ^ "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 Jan 2022.
  40. ^ "First AP1000 reactor enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 Oct 2018.
  41. ^ "Sanmen 2 AP1000 enters commercial operation – World Nuclear News". world-nuclear-news.org. Retrieved 7 Nov 2018.
  42. ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 Jul 2022.
  43. ^ "Construction starts on fourth Sanmen unit". world-nuclear-news.org. Retrieved 23 Mar 2023.
  44. ^ "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News"
  45. ^ "Shidaowan Guohe One 1"
  46. ^ "Shidaowan Guohe One 2"
  47. ^ "Shidaowan 1"
  48. ^ "Taipingling 1 connected to the grid". World Nuclear News. 16 February 2026. Retrieved 18 February 2026.
  49. ^ "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 Aug 2019.
  50. ^ https://www.world-nuclear-news.org/articles/construction-begins-on-fourth-taipingling-unit
  51. ^ "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale" (in French). Capital.fr. 14 Dec 2018. Retrieved 14 Dec 2018.[dead link]
  52. ^ "World's second EPR starts operations". Retrieved 10 Sep 2019.
  53. ^ "Fourth Tianwan unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 27 Dec 2018.
  54. ^ "Fifth Tianwan unit starts commercial operation". World Nuclear News. World Nuclear Association. Retrieved 9 Sep 2020.
  55. ^ "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News"
  56. ^ "Construction starts on eighth Tianwan unit: New Nuclear – World Nuclear News"
  57. ^ "Fast nuclear reactor to start construction in Fujian in 2017". 16 Aug 2015. Archived from the original on 17 Aug 2015. Retrieved 16 Aug 2015.
  58. ^ "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 Dec 2020.
  59. ^ "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. Retrieved 17 Nov 2023.
  60. ^ "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru
  61. ^ "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News"
  62. ^ "Yangjiang 5 enters commercial operation". world-nuclear-news.org. Retrieved 16 Jul 2018.
  63. ^ "Construction starts on first Zhangzhou unit – World Nuclear News". world-nuclear-news.org. Retrieved 18 Oct 2019.
  64. ^ "World's largest Hualong One nuclear power base successfully connects to State Grid". Retrieved 23 Nov 2025.
  65. ^ "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News"
  66. ^ "PRIS – Reactor Details"
  67. ^ "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News"
  68. ^ "Nuclear power plants in Finland". STUK. 6 Apr 2021. Retrieved 13 May 2022.
  69. ^ "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
  70. ^ "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
  71. ^ "PRIS – Reactor Details"
  72. ^ "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News"
  73. ^ https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=873
  74. ^ "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 9 December 2023.
  75. ^ "Germany shuts three of its last six nuclear plants". Retrieved 1 Jan 2022.
  76. ^ "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
  77. ^ "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 Jan 2020.
  78. ^ "First concrete poured for Hungary's Paks II nuclear project". world-nuclear-news.org. 2026-02-05. Retrieved 2026-02-08.
  79. ^ "PRIS – Reactor Details"
  80. ^ "東通原子力発電所1号機の着工について". Tokyo Electric Power Company Holdings, Inc.. Retrieved 27 Jun 2023.
  81. ^ "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 Jan 2016. Archived 9 Apr 2016 at the Wayback Machine. Retrieved 4 Apr 2016.
  82. ^ Makowsky, Peter; Liu, Jack; Ragnone, Iliana (23 May 2024). "Yongbyon Nuclear Scientific Research Center: Construction at the Radiochemical Laboratory". 38 North. The Henry L. Stimson Center. Retrieved 5 April 2026.
  83. ^ "PRIS - Reactor Details"
  84. ^ "Najważniejsze informacje – Polskie Elektrownie Jądrowe". pej.pl. Retrieved 2026-02-15.
  85. ^ "Poland's government confirms Westinghouse for nuclear plant". 4 Nov 2022.
  86. ^ "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 Oct 2022.
  87. ^ "South Korea's KHNP signs letter of intent on Polish nuclear". 31 Oct 2022.
  88. ^ "Taki reaktor chcą zbudować Orlen i Synthos". 18 Apr 2023.
  89. ^ "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 Jan 2020.
  90. ^ "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
  91. ^ "Кольскую АЭС-2 начнут строить в 2028 году". Retrieved 9 December 2023.
  92. ^ "Kursk's second unit retires after 45 years operation". Retrieved 31 Jan 2024.
  93. ^ "First Kursk II unit connected to the grid". world-nuclear-news.org. Retrieved 2 Jan 2026.
  94. ^ "Новак рассказал о сроках запуска первых двух блоков новой Курской АЭС-2" (in Russian). ПРАЙМ. 2025-09-11. Retrieved 2025-10-15.
  95. ^ "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 Apr 2019.
  96. ^ "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 Dec 2018.
  97. ^ "Four New NPP Units Will be Built in Russia"
  98. ^ "Ленинградской атомной станции добавят мощности". 15 March 2024.
  99. ^ "На энергоблоке №4 Ленинградской АЭС-2 приступили к бетонированию фундамента реактора" (in Russian). neftegaz.ru. 2025-03-20. Retrieved 2025-03-21.
  100. ^ "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 Jul 2021.
  101. ^ ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа" (in Russian). Interfax.ru. Retrieved 3 Sep 2021.
  102. ^ "Russia plans new generation of FNPPS – Nuclear Engineering International". 6 January 2021.
  103. ^ "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Archived from the original on 30 August 2022. Retrieved 30 Aug 2022.
  104. ^ "В Якутии собираются строить АЭС мощностью не менее 55 МВт"
  105. ^ ""Росатом" начал строительство реактора Брест-300 в Северске". 8 Jun 2021.
  106. ^ "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". 26 June 2020.
  107. ^ "VVER units planned for Leningrad and Smolensk"
  108. ^ Shut down after a 1977 refuelling incident; decommission in progress since 1979
  109. ^ "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 Jan 2009.
  110. ^ "Power commissioning of Mochovce 3 completed"
  111. ^ "Krško gets an overhaul : Corporate – World Nuclear News"
  112. ^ "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030." [The second block of NPP Krško could provide the first megawatts after 2030.] (in Croatian). Točka na I. 30 Nov 2022. Retrieved 14 Apr 2023.
  113. ^ "South Korean APR-1400 starts commercial operation : New Nuclear - World Nuclear News"
  114. ^ "Unit 2 at South Korean nuclear reactor enters commercial operation". 9 April 2024.
  115. ^ https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins
  116. ^ https://www.world-nuclear-news.org/articles/construction-starts-for-shin-hanul-unit-4
  117. ^ "Second APR-1400 unit starts commercial operation". world-nuclear-news.org. Retrieved 3 Sep 2019.
  118. ^ admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 Jun 2013 at the Wayback Machine, 25 May 2011
  119. ^ "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 Jul 2021. Retrieved 29 Apr 2022.
  120. ^ "封存核四 馬英九:為下一代保留選擇權" (in zh-tw). 自由時報電子報. 2014-04-27. Retrieved 2024-11-08. 馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
  121. ^ "Власти Турции заявили о планах запуска первого реактора на АЭС "Аккую" в 2026 г."
  122. ^ "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News"
  123. ^ https://bigpara.hurriyet.com.tr/haberler/ekonomi-haberleri/sinop-ve-trakya-nukleer-santralleri-icin-tarih-belli-oldu_ID1614158/
  124. ^ https://www.indyturk.com/node/761114/haber/enerji-bakanl%C4%B1%C4%9F%C4%B1-yetkilisi-a%C3%A7%C4%B1klad%C4%B1-yeni-n%C3%BCkleer-santraller-yolda
  125. ^ "В Україні збудують нову атомну станцію: названо місто будівництва". GSMinfo. 22 September 2022. Retrieved 9 December 2023.
  126. ^ "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 Feb 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022.
  127. ^ "Ukraine begins construction of new units at Khmelnitsky NPP". 17 April 2024.
  128. ^ "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO"
  129. ^ "UAE's first nuclear power plant begins commercial operations". Reuters. 6 Apr 2021. Retrieved 6 Apr 2021.
  130. ^ "Barakah / Unit 2 Begins commercial operations at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022.
  131. ^ "Third Barakah unit begins commercial operation : New Nuclear - World Nuclear News"
  132. ^ "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations". 5 Sep 2024.
  133. ^ Ambrose, Jillian (4 December 2024). "Four of UK’s oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved 4 December 2024.
  134. ^ "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 Aug 2022.
  135. ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 Jul 2022.
  136. ^ "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 Jan 2022.
  137. ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 Jan 2019.
  138. ^ "Wylfa nuclear power plant plans go ahead, creating Anglesey jobs". www.bbc.com. 13 November 2025. Retrieved 13 November 2025.
  139. ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  140. ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  141. ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  142. ^ "Brunswick-1". IAEA. Retrieved 14 Apr 2013.
  143. ^ "Brunswick-2". IAEA. Retrieved 14 Apr 2013.
  144. ^ "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 Jul 2021. Retrieved 29 Apr 2022.
  145. ^ "Idaho SMR project terminated". World Nuclear News. 9 November 2023. Retrieved 9 November 2023.
  146. ^ "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 Apr 2015. Archived from the original on 29 July 2023. Retrieved 5 Oct 2023.
  147. ^ Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park". Archived from the original on January 5, 2009. Retrieved 5 Oct 2023.
  148. ^ "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 Apr 2020. Archived from the original on 3 Aug 2020. Retrieved 30 Apr 2020.
  149. ^ "PRIS – Reactor Details"
  150. ^ StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 Dec 2014 at the Wayback Machine, 29 Dec 2014
  151. ^ "Vogtle Unit 3 goes into operation". Cision. 31 Jul 2023. Retrieved 31 Jul 2023.
  152. ^ "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News"
  153. ^ ""Росатом" начал заливку бетона на АЭС в Узбекистане". interfax.ru. 2026-03-24. Retrieved 2026-03-27.
  154. ^ "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden" (in Swedish). The Swedish Radiation Safety Authority. 2007-03-31. Retrieved 12 Jan 2023.
  155. ^ "IAEA Sweden reactors". IAEA. 2023-01-11. Retrieved 12 Jan 2023.
  156. ^ "Forsmarks reaktorer i siffror" (in Swedish). Vattenfall. Apr 2016. Retrieved 12 Jan 2023.
  157. ^ "MILSTOLPAR I VÅR HISTORIA" (in Swedish). Westinghouse. Retrieved 12 Jan 2023.
  158. ^ "Ringhals 1 inne på slutspurten" (in Swedish). SVT. 26 Oct 2020. Retrieved 29 Dec 2020.