Albury
StatusOperational
SystemVictorian railway network
LocaleVictoria, Australia
Predecessor

^ broad gauge

First18 April 1872 (age 154)
OperatorV/Line
Formeroperator
WebsiteV/Line Seymour on Twitter
Stops12
Distance315.935 km (196.313 mi)
FrequencyThree services daily each direction
Line usedSouth Kensington–West Footscray, Albion–Jacana, North East
ClassEconomy
AccessYes
CateringYes
BaggageYes
StockVLocity
OwnersVicTrack

The Albury line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves passengers between the state capital of Melbourne and the regional cities of Benalla, Wangaratta, Wodonga, and the NSW border city of Albury.

History

21st century

Conversion to standard gauge

After February 2008, train services on the line terminated at Wangaratta station, with road coaches operating from Wangaratta to Albury. This was due to the deteriorating track conditions between Seymour and Albury which were resulting in train speeds being reduced from 115 to 80 km/h (71 to 50 mph),[1] and trains not being able to make the return journey in the timetabled period.

On 30 May 2008, the then Premier of Victoria John Brumby announced the broad gauge track between Seymour and Albury would be converted to standard gauge, with the project to be combined with the Wodonga Rail Bypass away from the Wodonga CBD. Three V/Line passenger locomotives and 15 passenger carriages were also to be converted to standard gauge to operate the service.[2] Although the project was planned for completion by 2010,[3] it was not finished until the end of June 2011. While the gauge conversion program was being carried out, all Albury services operated as road coaches north of Seymour, connecting with trains operating between Seymour and Melbourne. 68 seats on the NSW TrainLink Melbourne-Sydney XPT service were also made available at V/Line ticket prices.[4]

Rail services on standard gauge commenced on 26 June 2011 with one service each way each day between Albury and Melbourne. A second daily train service was added from 31 October, with a third daily service commencing operations 22 April 2012, marking the end of road coach replacements on the line.[5] However, serious problems soon emerged with the condition of the standard gauge track north of Seymour, meaning that the new service became very unreliable due to speed restrictions, and trains were regularly replaced by buses.[6][7]

Regional Rail Revival

The North East Line Upgrade was completed in December 2020 as part of the Regional Rail Revival Program. Upgrades included track resurfacing, rail bridge upgrades, renewal of track turnouts at Violet Town and Seymour, a number of level crossing closures and upgrades, and upgrades to train stabling and accessibility at Albury station etc.[8][9][10] VLocity DMUs began running on the line on 30 December 2021.[11] The final scheduled locomotive-hauled service on the Albury line ran on 30 July 2022, and was led by V/Lines N class locomotive N464.[12] A new train timetable was introduced on 28 August 2022 with shorter journey times on all services.[13][14]

Network and operations

Routes

From Southern Cross railway station, the service runs through Melbourne Yard, then along the South Kensington–West Footscray railway line, the Albion–Jacana railway line, and then the North East line from Jacana station (where it does not stop) to Albury station. The entire route is along the Sydney–Melbourne rail corridor.

The line serves 12 stations across 304.9 kilometres (189.5 mi) of track. All stations are at ground level and within Victoria, with one station (Albury station) located in the neighbouring state of New South Wales.

StationAccessibilityOpenedTerrainTrain connectionsOther connections
Southern CrossYes—step free access1859[15]Ground level
Broadmeadows1873[15]
Seymour1872[15]
AvenelNo—steep ramp
EuroaYes—step free access1873[15]
Violet Town
Benalla
WangarattaNo—steep ramp
Springhurst
Chiltern
WodongaYes—step free access
AlburyNo—steep ramp1883[15]

Services

V/Line operates three daily passenger trains in each direction on the full length from Southern Cross station in Melbourne to Albury station in New South Wales.[16] Services run express and parallel to the Seymour and Shepparton V/Line services between Broadmeadows and Seymour stations. Services also do not stop between Southern Cross and Broadmeadows.

At other times, V/Line coaches also provide alternative connections between Seymour, Wangaratta and Albury.[16]

On-board amenities

The Albury service is classified by V/Line as a long-distance service and is run by six dedicated standard gauge VLocity sets, built specifically for the Albury line service. Each VLocity set consist of three carriages and accommodates 164 seats in a 2+2 configuration, six accessible spaces and storage for up to six bicycles. Toilets and luggage racks are available in addition to other amenities. The middle carriage is a buffet car, meaning cafe facilities are also available on-board all Albury services.[17][18]

The new VLocity sets had no first class cars when they were first introduced.[11] The lack of first class became irrelevant with the introduction of daily fare caps in March 2023 which removed any differentiation between first class and economy class seating.[19]

Before the VLocity sets were introduced, the service was locomotive hauled. Each individual carriage accommodated 74 seats in a 2+2 configuration, with each train set having two passenger cars and a cafe car.[20]

Operators

Prior to V/Line taking back operation of the Albury service from National Express in 2002, there had been 5 previous operators.[21] The majority of operations on the line have been government run, with these operators including the Victorian Railways, the State Transport Authority, and the Public Transport Corporation.[22]

OperatorAssumed operationsCeased operationsLength of operations
Victorian Railways
State Transport Authority (V/Line)
Public Transport Corporation (V/Line)
Public Transport Corporation (V/Line Passenger)
V/Line Passenger
National Express (as V/Line Passenger)
V/Line Passenger
V/Line

Accessibility

In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[23] The majority of stations on the corridor are fully accessible, however, there are some stations that haven't been upgraded to meet these guidelines.[24] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[24] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[24] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[24][25]

Projects improving station accessibility have included the Regional Rail Revival (RRL) program, which involves station rebuilds and upgrades.[26] These works have made significant strides in improving network accessibility, with more than 58% of the stations on the line classed as fully accessible. This number is expected to grow within the coming years as works progress on the RRL.[27]

References

  1. ^ "News - New timetable for Melbourne <> Albury services". www.vline.com.au. Archived from the original on 6 July 2011. Retrieved 2008-03-29.
  2. ^ "Premier of Victoria, Australia - FEDERAL-STATE CO-OPERATION DELIVERS MAJOR RAIL PROJECT". www.premier.vic.gov.au. Archived from the original on 17 September 2008. Retrieved 2008-05-30.
  3. ^ "Full Steam Ahead". Australian Broadcasting Corporation. 2008-05-30. Archived from the original on 12 February 2011. Retrieved 2008-05-30.
  4. ^ "Albury Line / North East rail upgrade works ~ V/Line". www.vline.com.au. Retrieved 2008-12-24.[dead link]
  5. ^ Bronwen Wade (26 June 2011). "They're back: V/Line trains return". ABC Goulburn Murray. Archived 13 November 2012 at the Wayback Machine. Retrieved 5 July 2011.
  6. ^ Coughlan, Kate & Thomas, Di (2012-08-31). "V/Line admits defeat". The Border Mail. Archived 28 July 2015 at the Wayback Machine. Retrieved 2013-03-05.
  7. ^ Carey, Adam (2012-12-17). "$290m loss on botched rail line". The Age. Archived 18 February 2013 at the Wayback Machine. Retrieved 2013-03-05.
  8. ^ "Donnybrook Station". Victoria’s Big Build. 2022-12-05. Retrieved 2023-07-20.
  9. ^ "Wallan Station". Victoria’s Big Build. 2022-12-05. Retrieved 2023-07-20.
  10. ^ "North East Line Upgrade". Victoria’s Big Build. 2023-02-06. Retrieved 2023-07-20.
  11. ^ "Modern VLocity trains for Albury line passengers". V/Line. 30 December 2021. Archived from the original on 8 January 2022. Retrieved 2022-01-08.
  12. ^ Bunn, Anthony (31 July 2022). "There was no hoopla from V/Line but train enthusiasts were keen to savour the moment as the N Class era ended". The Border Mail. Archived 1 August 2022 at the Wayback Machine. Retrieved 1 August 2022.
  13. ^ "Faster VLocity Services On The Way For North East Line | Premier of Victoria". www.premier.vic.gov.au. 22 July 2022. Retrieved 2023-07-20.
  14. ^ "Timetable changes on the Albury line". Public Transport Victoria. Retrieved 21 January 2024.
  15. ^ "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". 3 August 2018. Archived 9 December 2022 at the Wayback Machine. Retrieved 9 December 2022.
  16. ^ "Albury Line timetable". V/Line. 23 October 2022. Retrieved 21 January 2024.
  17. ^ Department of Transport (2020-04-23). "Design unveiled for new North East VLocity trains". transport.vic.gov.au. Archived from the original on 14 March 2022. Retrieved 2020-07-04.
  18. ^ "On board with V/Line". V/Line - Regional public transport for Victoria. Archived 15 May 2023 at the Wayback Machine. Retrieved 2023-05-15.
  19. ^
  20. ^ "Media Release: NEW LOOK V/LINE FLEET TAKES TO THE TRACKS". www.dpc.vic.gov.au. Archived from the original on 27 July 2011. Retrieved 2008-03-16.
  21. ^ "Coalition Government plans revealed on the privatisation of V/line Rail Services". Railpage. Retrieved 2023-07-16.
  22. ^ "V/Line Background". vline.com.au. Archived from the original on 6 July 2011. Retrieved 2008-03-27.
  23. ^ "Accessibility – Public Transport Ombudsman Victoria". www.ptovic.com.au. Archived 3 January 2023 at the Wayback Machine. Retrieved 3 January 2023.
  24. ^ "Station accessibility features". Metro Trains Melbourne. 2023. Archived 8 December 2022 at the Wayback Machine. Retrieved 13 May 2023.
  25. ^ "Accessing public transport". City of Melbourne. n.d. Archived 6 December 2022 at the Wayback Machine. Retrieved 13 May 2023.
  26. ^ Victoria’s Big Build (2022-12-14). "Now arriving: Warrnambool's 5th weekday return service". Victoria’s Big Build. Archived 13 April 2023 at the Wayback Machine. Retrieved 2023-04-13.
  27. ^ Public Transport Victoria. "Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived 12 August 2019 at the Wayback Machine. Retrieved 3 January 2023.